White Rock Windfarm

RJE has completed the 33kV double circuit (OPGW & OHEW) overhead line at White Rock Windfarm which comprised a 1040 meter gully span. The line was suspended on free stranding monopoles. The pole design/ detailing, installation (including stringing and tensioning) & procurement was performed by RJE Global.
The foundations were made up of rock anchors, pads and a pedestal foundation design, which was constructed by RJE.
Big thanks to the entire RJE team involved in making this a great success.

Read More

First Fire at Thaketa Power Station!

First Fire at Thaketa Power Station, Yangon Myanmar was achieved at 9.33pm 10th July.
Fantastic achievement by all involved in such a short time schedule. We would like to thank everyone for their efforts and in particular to the GE/RJE teams at site.
The plan is for today is to first synchronise/achieve full load and achieve COD milestone.