Thaketa Fast Power Installation

THE CHALLENGE | RJE were engaged by General Electric Ltd to install and integrate a TM2500 Unit Turbine within 45 days. The installation is a critical solution to Yangon’s power shortage and integral to MOEE’s development plan for the city.


Completed unit turbine in Yangon, Myanmar.


In partnership with General Electric Ltd & Golden Green Energy, RJE completed the Design, Installation and Commissioning of a 25MW 50Hz Trailer mounted Gas Turbine Generator. RJE’s specific role completed to IEC standard include:

  • Site Management, Project Plan Design works for Civil, Fuel and Power Control Systems and project management for all site construction execution in conjunction with an EHS Plan.
  • Logistics, Installation and integration of Fuel System, Power Control System, Substation Works, Piping, Grounding and Cabling & Supports.
  • Mechanical completion and first synchronization of TM2500 Unit.
  • Quality Control Processes, Coordination and interfacing services between International and Local parties.

The project achieved COD on 8th July 2017 and Final Acceptance from the client on 2nd Aug 2017.

Download Brochure

 

PROJECT: 2997
CLIENT NAME: General Electric Ltd
END USER: Yangon Regional Government
LOCATION: Thaketa Power Plant, Ayer Wun Main Road, Yangon
INDUSTRY CATEGORY: Power Generation
CONTRACT TYPE: Lump Sum Contract
CONTRACT DETAILS: Installation and Commissioning
UPDATES: Completed 2nd August 2017