THE CHALLENGE | RJE were engaged by General Electric Ltd to install and integrate a TM2500 Unit Turbine within 45 days. The installation is a critical solution to Yangon’s power shortage and integral to MOEE’s development plan for the city.
In partnership with General Electric Ltd & Golden Green Energy, RJE completed the Design, Installation and Commissioning of a 25MW 50Hz Trailer mounted Gas Turbine Generator. RJE’s specific role completed to IEC standard include:
- Site Management, Project Plan Design works for Civil, Fuel and Power Control Systems and project management for all site construction execution in conjunction with an EHS Plan.
- Logistics, Installation and integration of Fuel System, Power Control System, Substation Works, Piping, Grounding and Cabling & Supports.
- Mechanical completion and first synchronization of TM2500 Unit.
- Quality Control Processes, Coordination and interfacing services between International and Local parties.
The project achieved COD on 8th July 2017 and Final Acceptance from the client on 2nd Aug 2017.