THE CHALLENGE | Inside the existing Sein Pann Myaing compound, construct and install a new 66kV Outdoor GIS Substation and Indoor 11kV Switchgear utilising equipment supplied by YESC.
RJE provided the below turnkey services to operate and comply with the Yangon climate and relevant IEC standards:
- Detailed design, GIS foundation design drawing and detailed calculation, civil works, earthing system, sub-station layout, fencing, lighting, auxiliary services, cabling drawings, protection & control.
- Incoming and outgoing for 66kV and 11kV underground lines, cable jointing, terminations, grounding work (including civil works), installation of ac/dc control panel, battery bank and charger installation, testing, commissioning, and energizing.
- In the Substation switchyard, installation of 11 sets of 66kV incoming gas insulated switchgear outdoor GIS (7 incoming + 4 outgoing).